COMPLETED PROJECTS

Some of the Perth metropolitan and regional projects we have worked on are:

Leighton Beach, Fremantle WA

Performance Paving has worked on many projects including hundreds of square metres of cobblestones to be laid. Performance Paving completed cobblestone work at Leighton Beach.

Interpretive Walk Port Authority, Port Hedland WA

Interpretive walk is an iconic lookout for the Port Hedland Port Authority overlooking the harbour, on Esplanade Road. Works involved were feature paving, steps and ramps. Performance Paving completed all the works.

Newman Town Centre Stage 1, Newman WA

Performance Paving has undertaken various types of feature unit Mckeno paving to Newman Town Centre.


Other paving works completed:

  • 1800 x 1metre and 500mm limestone blocks in Canning Vale.
  • 7500sqm of paving with Style Stone and Urban Stone Products. With 3.3km of Concrete edge restraint.
  • 7500sqm of paving at Deanmore primary school supplied bedding sand and bobcat preparation.
  • 3500sqm of paving at Rosmoyne primary school supplying bedding sand and bobcat preparation.
  • 1050sqm of paving with 300x300x60mm Style Stone supplying bedding sand and bobcat preparation and installing riser and tread to steps.
  • 2000sqm or paving at Masenod Primary School supplying sand and bobcat preparation. Supply and install concrete edge restraints.
  • 1500sqm of paving 400x400x60mm pavers at Atwell primary school.
  • Many unit projects from 100sqm ton 2000sqm of paving and supplying preparation and bedding sand supply.
  • 3500sqm of paving at St Brigids primary school with 300l/m of bullnose to riser and treads.
  • 600sqm of street scape to burns beach Road.
  • 400sqm of street scape to Hodges Drive Joondalup.
  • 1500sqm of 400x400x40mm concrete pavers supplying bedding sand and bobcat preparation to Meadow springs Mandurah sports centre.
  • 2000sqm of paving with 400x400x60mm concrete Style Stone around Canning Vale community centre and street scape paving supplying bobcat preparation and bedding sand.
  • 1500sqm of street scape to their Lords Street project.
  • 1000sqm of street scape to Baldivis Medical centre.
  • 2000sqm unit development in York.
  • 1800sqm Aquinas College.